---
title: Healthcare Facility Remodels in Dallas-Fort Worth | Drennan
description: Repairs, remodels and finish work in occupied clinics, hospitals and labs across Dallas-Fort Worth. Infection control, after-hours work and welded sheet vinyl.
---

[Skip to content](https://www.drennanservices.com/industries/healthcare-facilities#main)

[![Drennan Property Services](https://www.drennanservices.com/hs-fs/hubfs/drennan-logo-white-red.png?width=201&height=48&name=drennan-logo-white-red.png)](https://www.drennanservices.com/?hsLang=en)

Menu

[Services](https://www.drennanservices.com/services?hsLang=en) [Industries](https://www.drennanservices.com/industries?hsLang=en) [About](https://www.drennanservices.com/about?hsLang=en) [(469) 644-9743](tel:+14696449743) [Request a Proposal](https://www.drennanservices.com/request-a-proposal?hsLang=en)

Healthcare Facilities

# Healthcare facility remodels and repairs in Dallas-Fort Worth

We work in occupied clinics, hospitals and labs. We build the schedule around your patients and staff.

![New washer-disinfectors and pass-through window in a sterile processing department](https://www.drennanservices.com/hs-fs/hubfs/drennan-sterile-processing-washers-finished.jpg?width=1400&name=drennan-sterile-processing-washers-finished.jpg)

## Work that keeps the building open

Most healthcare work happens while the floor is still seeing patients. We plan for it at the site walk.

- Nights, weekends and phased work so departments stay open
- One point of contact who works with your facility manager and infection prevention team
- Hallways and adjacent rooms protected, and our area cleaned at the end of every shift
- Badging and site orientation done before day one

![Floor protection run through an occupied corridor so staff and carts keep moving](https://www.drennanservices.com/hs-fs/hubfs/drennan-occupied-corridor-floor-protection.jpg?width=1600&name=drennan-occupied-corridor-floor-protection.jpg)

Floor protection run through an occupied corridor so staff and carts keep moving.

## Infection control (ICRA)

We follow the hospital's ICRA process and work directly with its infection prevention team on every job. They set the risk level. We build and run the containment it calls for. We usually supply the barriers and negative air ourselves, so one team stays in control of it, unless the hospital wants to provide its own.

- Dust barrier walls sealed floor to ceiling, with a zipper or hard door at the entry
- Negative air machines with HEPA filtration when the job calls for it
- Tacky mats at the containment entrance and exit
- Disposable coveralls, shoe covers and hair covers, put on going in and taken off coming out
- Debris hauled out on the route the hospital approves, in covered carts when the job calls for it
- The area wiped down at the end of every shift, coordinated with the hospital's janitorial team so it's clean before staff arrive the next morning

![Containment wall with a zipper door, and a tacky mat at the entrance](https://www.drennanservices.com/hs-fs/hubfs/drennan-icra-containment-tacky-mat.jpg?width=1600&name=drennan-icra-containment-tacky-mat.jpg)

Containment wall with a zipper door, and a tacky mat at the entrance.

![Corridor sealed off and floors protected for the duration of the work](https://www.drennanservices.com/hs-fs/hubfs/drennan-corridor-containment-walls.jpg?width=1600&name=drennan-corridor-containment-walls.jpg)

Corridor sealed off and floors protected for the duration of the work.

## Sterile processing equipment installs

We have experience managing the replacement of sterile processing washers and sterilizers while the hospital stays open. Instruments come in dirty on the decontamination side and run through the washers. They come out on the clean side and go to the sterilizers. Surgery can't stop for us, so the work gets built around the surgery schedule.

We coordinate the hospital, the equipment manufacturer and our licensed subcontractors on one phased schedule. The facility director hears from us at every step.

### How an equipment install runs

1. **After the last case.** Work starts once the day's surgeries are done, often on a Friday, so the hospital keeps its full surgery schedule.
2. **Demo and prep.** Old equipment out, walls reworked for the new units.
3. **Surprises handled fast.** Sometimes demo turns up a problem in the wall, like a gas line in the way. We write a quick change order, walk it with the facility director and keep moving. Our licensed subcontractors reroute it, and we can add lines for future equipment while the wall is open.
4. **Floor ready.** Patched with quick-set material so the equipment moves in on schedule.
5. **Equipment set.** The manufacturer sets the units and starts connections. We fit the wall for any pass-through window, our subcontractors make the plumbing and compressed air connections, and we patch and paint around the units.
6. **Quality walk.** Walked with the client before we leave.
7. **Final finish.** Decontamination and clean rooms painted, two coats.

The department stays down for the shortest window we can plan.

[See the full project write-up with photos →](https://www.drennanservices.com/projects/sterile-processing-washer-replacement?hsLang=en)

![Before. The existing washers, ready for removal](https://www.drennanservices.com/hs-fs/hubfs/drennan-sterile-processing-before.jpg?width=1600&name=drennan-sterile-processing-before.jpg)

Before. The existing washers, ready for removal.

![During. Wall reworked, utilities roughed in, pass-through opening framed](https://www.drennanservices.com/hs-fs/hubfs/drennan-sterile-processing-wall-rough-in.jpg?width=1600&name=drennan-sterile-processing-wall-rough-in.jpg)

During. Wall reworked, utilities roughed in, pass-through opening framed.

![Equipment set. Connections made, patching done, ready for paint](https://www.drennanservices.com/hs-fs/hubfs/drennan-sterile-processing-washers-set.jpg?width=1600&name=drennan-sterile-processing-washers-set.jpg)

Equipment set. Connections made, patching done, ready for paint.

![After. Two coats of paint, back in service](https://www.drennanservices.com/hs-fs/hubfs/drennan-sterile-processing-finished-paint.jpg?width=1600&name=drennan-sterile-processing-finished-paint.jpg)

After. Two coats of paint, back in service.

## Laboratories

We've worked across nearly every department of a large regional lab, from the testing floor to the business offices. Furniture moves, flooring, ceiling tiles, patch and paint, refreshes and office remodels, all done around the lab's schedule.

Testing departments, specimen receiving and processing, lab operations and business offices.

**Fume hoods and biosafety cabinets.** We have experience moving fume hoods and biosafety cabinets in working labs. A certified technician shuts each unit down, disconnects it and wraps it. We move and set it, and the technician makes the connections and certifies it before it goes back into service. We coordinate the whole move around the lab's schedule so testing keeps running.

![Biosafety cabinet shut down and wrapped by the certifier, ready to move](https://www.drennanservices.com/hs-fs/hubfs/drennan-biosafety-cabinet-wrapped-for-move.jpg?width=1600&name=drennan-biosafety-cabinet-wrapped-for-move.jpg)

Biosafety cabinet shut down and wrapped by the certifier, ready to move.

![Lab wall patched and prepped for paint](https://www.drennanservices.com/hs-fs/hubfs/drennan-lab-wall-patching.jpg?width=1600&name=drennan-lab-wall-patching.jpg)

Lab wall patched and prepped for paint.

## Floors and finishes built for clinical space

- **Sheet vinyl with heat-welded seams.** The seam is fused with a matching weld rod, so fluids and cleaning chemicals stay on top of the floor and out of the joint.
- **Integral flash cove.** The floor turns up the wall, so there's no seam at the base for dirt to collect.
- Rubber, LVT and VCT for corridors, offices and back of house
- Slab patching and leveling before new flooring goes down
- Drywall patching and painting, matched to the existing finish

## Spaces we work in

- Operating rooms
- GI and procedure rooms
- Sterile processing
- Laboratories
- Medical office suites
- Dental offices: wall repairs and moving dental chairs
- Conference and admin space inside healthcare buildings

![Procedure room remodel, near the finish](https://www.drennanservices.com/hs-fs/hubfs/drennan-procedure-room-remodel.jpg?width=1600&name=drennan-procedure-room-remodel.jpg)

Procedure room remodel, near the finish.

![Dental office. Wall repairs and dental chairs moved](https://www.drennanservices.com/hs-fs/hubfs/drennan-dental-office-repairs.jpg?width=1600&name=drennan-dental-office-repairs.jpg)

Dental office. Wall repairs and dental chairs moved.

## How a healthcare job runs

1. Site walk with your facility contact. We look at the space and the infection control requirements.
2. Written proposal with line-item pricing and the work hours spelled out.
3. Badging and the ICRA permit in place before work starts.
4. Work done in the hours you approved, with containment checked every shift.
5. Closeout with before and after photos and a walk with your team. Containment comes down after sign-off.

## Have a project coming up? Send it to us.

Tell us about the space and we will send a written proposal.

[Request a Proposal](https://www.drennanservices.com/request-a-proposal?hsLang=en) [(469) 644-9743](tel:+14696449743)

[![Drennan Property Services](https://www.drennanservices.com/hs-fs/hubfs/drennan-logo-white-red.png?width=230&height=55&name=drennan-logo-white-red.png)](https://www.drennanservices.com/?hsLang=en)

Elevating Property Standards.

Commercial remodels and facility repairs for healthcare, office, industrial and multifamily properties in Dallas-Fort Worth, Texas.

### Services

[Remodels and Renovations](https://www.drennanservices.com/services/remodels-renovations?hsLang=en) [Facility Repairs](https://www.drennanservices.com/services/facility-repairs?hsLang=en) [Refreshes](https://www.drennanservices.com/services/refreshes?hsLang=en) [Commercial Flooring](https://www.drennanservices.com/services/commercial-flooring?hsLang=en) [Make-Ready Turns](https://www.drennanservices.com/services/make-ready-turns?hsLang=en) [Tenant Clear-Outs](https://www.drennanservices.com/services/tenant-clear-outs?hsLang=en)

### Industries

[Healthcare Facilities](https://www.drennanservices.com/industries/healthcare-facilities?hsLang=en) [Corporate Offices](https://www.drennanservices.com/industries/corporate-offices?hsLang=en) [Industrial Facilities](https://www.drennanservices.com/industries/industrial-facilities?hsLang=en) [Multifamily Communities](https://www.drennanservices.com/industries/multifamily?hsLang=en)

### Contact

[(469) 644-9743](tel:+14696449743) [info@drennanservices.com](mailto:info@drennanservices.com) Dallas-Fort Worth, Texas [Request a Proposal](https://www.drennanservices.com/request-a-proposal?hsLang=en)

Drennan Property Services LLC [About](https://www.drennanservices.com/about?hsLang=en)[Privacy Policy](https://www.drennanservices.com/privacy-policy?hsLang=en)

[Call](tel:+14696449743)[Request a Proposal](https://www.drennanservices.com/request-a-proposal?hsLang=en)

```json
{
  "@context" : "https://schema.org",
  "@type" : "LocalBusiness",
  "areaServed" : [ "Dallas-Fort Worth, Texas", "Dallas, TX", "Fort Worth, TX", "Arlington, TX", "Plano, TX", "Irving, TX", "Frisco, TX", "McKinney, TX", "Garland, TX", "Grand Prairie, TX", "Denton, TX", "Richardson, TX", "Lewisville, TX", "Carrollton, TX", "Mesquite, TX", "Southlake, TX", "Rockwall, TX" ],
  "description" : "Commercial remodels and facility repairs in Dallas-Fort Worth, Texas.",
  "name" : "Drennan Property Services",
  "telephone" : "+1-469-644-9743",
  "url" : "https://www.drennanservices.com"
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://www.drennanservices.com/#business",
  "@type" : "GeneralContractor",
  "address" : {
    "@type" : "PostalAddress",
    "addressCountry" : "US",
    "addressLocality" : "Fort Worth",
    "addressRegion" : "TX",
    "postalCode" : "76244"
  },
  "areaServed" : [ {
    "@type" : "AdministrativeArea",
    "name" : "Dallas County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Tarrant County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Collin County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Denton County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Rockwall County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Kaufman County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Ellis County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Johnson County, Texas"
  }, {
    "@type" : "AdministrativeArea",
    "name" : "Parker County, Texas"
  } ],
  "description" : "Commercial remodels and facility repairs for healthcare, office, industrial and multifamily properties in Dallas-Fort Worth, Texas.",
  "email" : "info@drennanservices.com",
  "hasOfferCatalog" : {
    "@type" : "OfferCatalog",
    "itemListElement" : [ {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Commercial Remodels and Renovations"
      }
    }, {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Facility Repairs"
      }
    }, {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Refreshes"
      }
    }, {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Commercial Flooring"
      }
    }, {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Make-Ready Turns"
      }
    }, {
      "@type" : "Offer",
      "itemOffered" : {
        "@type" : "Service",
        "name" : "Tenant Clear-Outs"
      }
    } ],
    "name" : "Services"
  },
  "legalName" : "Drennan Property Services LLC",
  "name" : "Drennan Property Services",
  "telephone" : "+1-469-644-9743",
  "url" : "https://www.drennanservices.com/"
}
```